10% Black Friday Sale On all courses across the site all November, with code FRI10 View Sale
Menu
All Courses
Nationwide courses all around the country
4-11-2026
| ✓ OZEV's EV chargepoint grant landscape changed on 1 April 2026, with some schemes closing and others changing. | ✓ The continuing home and workplace schemes offer up to £500 per socket, subject to eligibility. |
| ✓ Grant eligibility must be confirmed before the chargepoint is installed. | ✓ The updated process includes a new platform and photo-evidence requirements for relevant schemes. |
| ✓ Only OZEV-authorised installers can submit eligible grant claims on behalf of customers. | ✓ EV chargepoint training supports technical competence, but does not automatically provide OZEV authorisation. |
The government's EV chargepoint grant landscape changed on 1 April 2026. Some schemes that were previously available closed to new applications. Others were updated with revised grant values and new process requirements. If you are an electrician or installer carrying out EV chargepoint work, or advising customers who want to fund their installation through a grant, understanding what the current position is matters for every conversation you have with a potential customer.
This is not an article about the broader EV charging UK market or long-term infrastructure projections. It is a practical guide to the specific changes that took effect in April 2026: which schemes remain available, what they pay, what the application process now requires, and what OZEV authorisation means for installers who want to offer grant-backed installations.
The Office for Zero Emission Vehicles (OZEV) restructured its residential and commercial EV chargepoint grant schemes with effect from 1 April 2026. The restructuring had two main components.
First, certain grant schemes that were previously open to new applications closed on 31 March 2026. Customers and installers who were planning to apply under those schemes needed to have submitted applications before that date. Applications received after 31 March 2026 under those closed schemes are no longer accepted.
Second, the schemes that continued beyond 1 April 2026 were updated. Grant values were revised, and the application and claims process changed, including the introduction of a new platform and updated photo-evidence requirements for relevant schemes. The changes are not trivial process adjustments; they affect how grants are applied for, when installation can take place, and who can submit the claim.
The practical consequence for electricians and installers is straightforward: if your knowledge of the OZEV grant landscape is based on how things worked before April 2026, it needs updating. The schemes your customers have heard about, or that you have been advising on, may no longer exist in the same form, may no longer be open, or may now operate under different rules.

As of 1 April 2026, the grant schemes that remain open to new applications are focused on home charging and workplace charging. The key schemes continuing until 31 March 2027 are:
The EV Chargepoint Grant supports eligible households installing a home chargepoint. Following the April 2026 changes, the grant increased to a maximum of £500 per socket, subject to eligibility criteria.
Eligible customers include those in flats, renters in privately rented accommodation, and homeowners who meet specific criteria. The eligibility conditions specify who can apply and what type of property qualifies. Customers should check their eligibility directly via GOV.UK before approaching an installer, since grant eligibility is confirmed before installation, not after.
The Workplace Charging Scheme (WCS) supports businesses, charities, and public sector organisations installing chargepoints at the workplace. The April 2026 changes also set the maximum support at £500 per socket, subject to eligibility.
The WCS covers the cost of supply and installation rather than the hardware alone. Eligible organisations that install multiple sockets can claim per socket up to the scheme's maximum. As with the home charging grant, only installations carried out by OZEV-authorised installers using equipment that meets the scheme's technical requirements are eligible.
Eligible state-funded education institutions can access higher grant support than is available under the standard WCS terms. Schools and other qualifying education settings should check the current scheme overview on GOV.UK for the specific support level applicable to their category.
The April 2026 restructuring meant that several grant schemes that were previously open closed to new applications on 31 March 2026. The authoritative current list of which schemes are open and which have closed is maintained on GOV.UK.
If a customer approaches you having heard about a specific grant scheme, or with an expectation based on information from before April 2026, the first check should always be whether that scheme is still open to new applications. Installers who advise customers based on pre-April 2026 information risk directing them toward schemes that no longer exist or have changed substantially.
For the definitive current position, the GOV.UK page on electric vehicle chargepoint grants maintains the up-to-date list of available schemes and their eligibility criteria.
The changes that took effect from April 2026 include process requirements that affect how installers and customers must approach a grant-backed installation. These are not minor administrative details, getting them wrong can invalidate a grant claim.
The application and claims process for the updated schemes operates through a new government platform. Installers and customers who are familiar with how previous applications were submitted should familiarise themselves with the new platform and its requirements before processing a grant claim.
Relevant schemes now require photo evidence as part of the claims process. The specific photo requirements are set out in the installer guidance on GOV.UK. Installers should understand what evidence they need to capture at the point of installation and ensure it is submitted correctly through the platform.
This is the most important process point for customers to understand, and it is something installers should communicate clearly from the outset.
Customers must not install the chargepoint before OZEV confirms grant eligibility.
Grant eligibility is assessed as part of the application process, before installation. If a customer purchases and installs a chargepoint before their application has been approved, they are no longer eligible to claim the grant for that installation. The scheme requires the eligibility to be confirmed first; the installation follows grant approval, not the other way around.
This is a regular source of difficulty for customers who self-source equipment and arrange installation without checking grant eligibility first. Installers who communicate this clearly at the point of first enquiry protect both their customers and their own relationship with those customers.
Only OZEV-authorised installers can submit grant claims on behalf of eligible customers. If an installation is carried out by an electrician or installer who does not hold OZEV authorisation, the customer cannot claim the grant, regardless of the quality of the installation, the eligibility of the customer, or the suitability of the equipment.
The chargepoint itself must also meet the scheme's equipment requirements. Not every chargepoint model is eligible under every scheme. Installers should check that the product specified meets the current requirements before committing a customer to a particular unit.

OZEV authorisation is a specific regulatory status that permits an installer to apply for and claim grants on behalf of eligible customers under OZEV's residential and commercial chargepoint grant schemes.
Becoming an OZEV-authorised installer requires completing a specific registration process through OZEV. GOV.UK sets out the requirements, including the relevant qualifications and competency evidence needed, on its dedicated page for prospective authorised installers.
The point that matters here: completing an EV chargepoint installation training course does not automatically make you an OZEV-authorised installer.
This is a distinction worth being direct about, because confusion between the two is common. Training in EV chargepoint installation develops your technical competence, your ability to carry out the electrical work involved in installing a chargepoint safely and to the required standard. That technical competence is a necessary part of what OZEV requires, but OZEV authorisation also involves a registration process, ongoing obligations, and compliance with scheme rules that extend beyond the training itself.
An electrician who has completed EV chargepoint installation training has the technical foundation. To become OZEV-authorised, they need to complete the OZEV registration process in addition to holding relevant qualifications. The two are complementary, technical training supports the competence element; OZEV registration handles the authorisation status.
For electricians who want to operate in the grant-backed EV charge points market, pursuing both makes sense. Technical training without OZEV authorisation means you can carry out the installation work, but your customers cannot access grants unless they find a separate OZEV-authorised installer to process the claim. OZEV authorisation without technical competence means you cannot carry out the work safely or to the required standard.
For electricians in London and across the UK who work on residential and commercial electrical installations, the EV chargepoint market is a growing and well-funded area. The OZEV grant schemes create demand for qualified, authorised installers, customers actively seek out OZEV-authorised installers when they want a grant-backed installation, because only those installers can process the claim.
The demand signal is real: EV charging London and the broader EV charging UK market continue to grow. The 2026 grant changes do not reduce the overall level of support available, they update its terms and focus it. Installers who are both technically competent and OZEV-authorised are positioned to serve customers who want grant-backed installs throughout the current scheme period to 31 March 2027.
The practical checklist for electricians considering EV chargepoint work:
Kelly Energy Training delivers gas and electrical training from its centre in Enfield, North London, including renewables training courses that support electricians moving into the EV chargepoint market.
Kelly Energy Training offers EV Charger Installation training for appropriately qualified electrical professionals. This course develops the technical competence needed to carry out EV chargepoint installations, the wiring, consumer unit considerations, earthing requirements, smart charger integration, and the relevant installation standards.
Important: this training supports the technical competence element of EV chargepoint work. Completion of the course does not in itself make you an OZEV-authorised installer. OZEV authorisation requires a separate registration process through OZEV/DVSA, the GOV.UK page on becoming an OZEV-authorised installer sets out what is required. Technical training and OZEV authorisation are both needed to offer the full package to grant-seeking customers; the Kelly Energy Training course addresses the technical side.
EV chargepoint installation sits within the broader renewables training portfolio alongside solar PV and heat pump qualifications. For electricians considering which area to prioritise, our guide to solar panels, heat pumps, and EV charging, which renewables course suits you walks through the options.
EV chargepoint installation sits on top of a strong electrical foundation. Kelly Energy Training delivers:
For electricians in London and across the UK looking for electrical training courses, Kelly Energy Training's Enfield centre offers accessible, expert-led training close to the capital. The centre also delivers gas certification for engineers building a dual qualification portfolio, all from one location in North London.
Training courses Enfield: Kelly Energy Training is based in Enfield and accessible from across North London, East London, and the wider region. For engineers from further afield seeking electrical training courses UK-wide, the team can advise on course availability and options.
View all courses at Kelly Energy Training or contact the team to discuss the right course for your situation.
Explore the training available through Kelly Energy Training or speak to our team about the right course for your current qualifications and goals.
Common questions about the 2026 EV chargepoint grant changes, installer authorisation and EV charging training.
As of 1 April 2026, the grant schemes remaining open to new applications are the EV Chargepoint Grant for eligible home charging customers and the Workplace Charging Scheme for eligible businesses, charities, and public sector organisations. Higher support is available for eligible state-funded education institutions. Both continuing schemes run until 31 March 2027. Some schemes that were previously available closed to new applications on 31 March 2026. For the authoritative and up-to-date list, see the GOV.UK electric vehicle chargepoint grants pages.
Following the April 2026 changes, both the EV Chargepoint Grant (for eligible home charging customers) and the Workplace Charging Scheme offer up to £500 per socket, subject to eligibility. Eligible state-funded education institutions may access higher support under the Workplace Charging Scheme. The specific eligibility conditions and any caps on the number of sockets per application should be confirmed on GOV.UK before advising customers.
No. Under the current OZEV grant schemes, customers must not install the chargepoint before OZEV confirms their grant eligibility. The application process and eligibility check must be completed first. Customers who install a chargepoint before their grant application is approved are no longer eligible to claim the grant for that installation. This is one of the most important points for installers to communicate clearly to customers from the start of any conversation about grant-backed installations.
OZEV authorisation is a specific regulatory status that permits an installer to apply for and claim government EV chargepoint grants on behalf of eligible customers. It requires completing a registration process through OZEV that goes beyond holding a training certificate. An EV chargepoint installation training course, such as the course available at Kelly Energy Training, develops the technical competence to carry out the installation work. Technical training is part of what OZEV requires, but the OZEV authorisation itself is a separate registration process. The two are complementary: training provides the competence foundation; OZEV registration provides the authorised status. Details of the registration requirements are on GOV.UK.
You do not need OZEV authorisation to carry out EV chargepoint installations as a general matter of electrical work, but your customer will not be able to claim a government grant for that installation unless it is carried out by an OZEV-authorised installer. If your customers are seeking grant-backed installations, you will need to be OZEV-authorised to process the claim on their behalf. If you are carrying out EV chargepoint installations outside of grant-backed schemes, the OZEV authorisation requirement does not apply, but you still need the relevant technical competence, current 18th Edition qualification, and any other relevant certifications for the installation work.
Kelly Energy Training delivers EV Charger Installation training and renewables training courses from its centre in Enfield, North London. The course is designed for appropriately qualified electrical professionals and develops the technical competence for EV chargepoint installation work. The centre also delivers 18th Edition electrical qualifications (updated to BS 7671:2018+A4:2026), Level 3 LCL Awards, and electrical certification. Contact Kelly Energy Training here to discuss the course options available and book your place.
Training Centre - Enfield, North London, 1 Jeffreys Rd, Enfield EN3 7PN
Head Office - Kelly House, Fourth Way, Wembley
Middlesex, HA9 0LH
We are always recruiting for the best people in the industry. Click here to see our latest vacancies.